Thursday, May 3, 2012

13 WATERFALL


The decision was made to reintroduce the water feature on hole 13. This definitely enhances the club's entrance way.  Once the preliminary plans were posed, we went to task to complete the waterfall. After a few setbacks the falls were turned on last Wednesday to great relief and jubilation!!  Here are few pics which chronicle the installation.



Day lighting the 6" pipe and reshaping the stream

Installing the liner

Laying the sod

Designing and building the pump sled.

The pump and sled ready to dive. This will aid in service removal.


COMPLETION!


Wednesday, May 2, 2012

 



I have been asked a few times recently, why did you go out and beat up the greens after they finally healed from aerification? The Graden process we performed on the greens earlier this year sliced a channel about 1 to 1 1/2 inches down. This does a great job removing the dense top layer, but we must also open channels deeper into the soil profile. The Verti-Drain machine accomplishes this using a 3/8" X 10" solid tine to reach down 7-9 inches. These spaces allow for air and water to penetrate and gives a place for the roots to grow. The deeper the roots can dive the better chance for survival during the hot summer months.