![]() |
| 2 feet of drain pipe added to raise the height. |
![]() |
| Soil added and reshaped. |
![]() |
| Final hand work and edging before we plate tamped the floor. |
![]() |
| New drain installed. |
![]() |
| Stapling and gluing down the bunker liner. |
![]() |
| 15 green side completed! |
![]() |
| 2 feet of drain pipe added to raise the height. |
![]() |
| Soil added and reshaped. |
![]() |
| Final hand work and edging before we plate tamped the floor. |
![]() |
| New drain installed. |
![]() |
| Stapling and gluing down the bunker liner. |
![]() |
| 15 green side completed! |
![]() |
| Waiting for sod. |
![]() | ||||
| Finishing up the bunker slopes. |

![]() |
| Walk on/off restored. |
![]() |
| New look on # 5 |
![]() |
| Pic # 2 Nearly 10 inches of sand! |
![]() |
| Pic #1 First step - sand removal |
![]() | ||
| Pic # 4 Removing the years of sand above the bunker. |
![]() |
| Pic # 5 Newly shaped front face. |
![]() | |||||
| Pic # 6 Reconfigured bunker with liner installed. (Notice left edge of bunker closest to Derek has been smoothed to remove the small pocket seen in the top left of pic #3) |
![]() | |
| Pic # 7 Stripping away the old sod. |
| Updates to follow soon! |
![]() | |||
| Right of 18 Fairway |
![]() |
| Getting close to the red zone on the right of two fwy. |
![]() |
| Our hard working crew ready to go on the new Toro cutting units! |
![]() |
| Roots diving deep 1 month after aerification. |
![]() |
| 18 healed up and ready to go! |