| Sod removal |
| Removing soil to finish grade. The depth is 8" |
| Ready for sand. We used original mix from the overly large 18 Blue tee. |
| Finished Tee. We will have 21 teeing positions from the back 1/3 of the white tee to the front 1/3 of the black tee. |
| Sod removal |
| Removing soil to finish grade. The depth is 8" |
| Ready for sand. We used original mix from the overly large 18 Blue tee. |
| Finished Tee. We will have 21 teeing positions from the back 1/3 of the white tee to the front 1/3 of the black tee. |
No comments:
Post a Comment